Project Accounting Cost Codes
Cost codes: give every taka a place on the project
A cost code is a label for a kind of work or phase: preliminaries, concrete, equipment. Budgets and costs are tagged to it, so you can see where the money is going, not just how much.
Now onboarding companies in Dhaka.
PRJ-AUTOMATION · Line Automation Upgrade
rd_capex · cost_plus · —active
Cost codes· 6
+ Add cost codeThe job-costing backbone (WBS / phase dimension). Budgets and postings are tagged to a cost code; the cost type (labour / material / equipment / subcontract / other) is set per budget line, so the Job Cost report becomes a cost-code by cost-type matrix.
| Code | Name | Active |
|---|---|---|
| 01 | Preliminaries | Yes |
| 02 | Civil works | Yes |
| 03 | Equipment & machinery | Yes |
| 03-100 | Conveyor and sorting line | Yes |
| 04 | Electrical & controls | Yes |
| 05 | Commissioning | Yes |
New cost code
Code (e.g. 03-300, CSI-style)
Name (e.g. Cast-in-place Concrete)
Parent cost code (optional)
Sort order
Active
Notes
How a cost code structure works
Start with a few top-level codes, then nest detail under them. The shape is yours to choose.
- 1Top level
Phases or trades
Add a top-level code for each phase, such as 01 Preliminaries or 03 Concrete.
- 2Nested
Detail under each
Nest finer codes under a parent, such as 03-100 Foundations under 03 Concrete.
- 3Tagged
Used everywhere
Budget lines and bills are tagged to a code, so the reports follow the same structure.
What you fill in on a new cost code
- Code
- Your own numbering, such as 03-300 or a CSI-style code.
- Name
- What the code is for, such as Cast-in-place Concrete.
- Parent cost code
- Optional. Pick a parent to nest this code under it.
- Sort order and active
- Where it sits in the list, and whether it is still in use.
- Notes
- Anything the team should know about the code.
Cost codes link planning to spending
They are set up once for a project, then used by the budget, the bills and the reports.
Cost codes for how projects are actually run
Site managers think in phases and trades, accountants think in accounts. A cost code is the bridge between the two.
Your own numbering
Use the codes your engineers already use.
Parent and child
Roll small codes up into phases for a clean summary.
Switch off, do not delete
An unused code can be made inactive, and history stays.
One structure per project
Each project has its own codes, so different jobs can be split differently.
One code, from set-up to report
A sample code for equipment, the way it usually runs.
03 Equipment & machinery is added as a top-level code.
03-100 Conveyor and sorting line is nested under it.
A budget line is tagged to the code.
A purchase order is assigned to it.
Job Cost shows its budget, committed and actual.
How different trades use cost codes
- Retail
Fit-outs split by trade and area.
- Food & Hospitality
Build-outs split by kitchen, bar and dining.
- Real Estate
Buildings split by phase, from foundations to finishes.
- Consulting
Engagements split by deliverable.
- Manufacturing
Plant projects split by equipment, civil and controls.
- Health & Fitness
Clinic fit-outs split by room and system.
- Trades
Jobs split by labour, parts and travel.
- Others
Programmes split by activity.
Questions we get about cost codes
What is a cost code?
A label for a kind of cost on a project, used to group budgets and spending.
Can codes be nested?
Yes. Pick a parent when you add a code.
What do I need to fill in?
A code and a name. Parent, sort order, active and notes are optional.
Where is the cost type set?
On each budget line, so the report can show code by cost type.
Can I stop using a code?
Yes. Set it to inactive, and past entries stay.
Where is Adon ERP available?
We are currently onboarding companies in Dhaka. Book a demo and we will walk through a sample project with you.
Bring a project’s cost breakdown. We will turn it into cost codes in the demo.
A live demo in English or Bangla, using sample books close to your own trade, with time for your accountant’s questions.