Adon ERP / GARMENT OPERATIONS
A style becomes an order.
Keep every piece in context.
Explore the connection between the size set, production work and the records behind the garment—from the first breakdown to the next factory handoff.
THE WORKFLOW, IN CONTEXT
Give the garment order a readable path.
Start with the pieces behind the order.
Use the local size-ratio exercise to discuss how an order quantity becomes a clear size breakdown.
- 01Order quantity
- 02Size ratio
- 03Whole-piece allocation
EXPLORE A SMALL PART OF THE WORK
Turn a size ratio into a piece breakdown.
Adjust a fictional order quantity and four whole-number size ratios. The example distributes whole pieces exactly; it does not create a cutting plan or production order.
Ratio units are whole non-negative numbers. At least one must be positive. All figures belong only to this local example.
A breakdown that adds up.
Largest-remainder rounding preserves the total. This does not save an order, reserve fabric or create a marker/cutting plan.
THE SUPPORTING PRODUCT CONVERSATION
Follow the relevant product detail.
Explore existing ERP presentations, then discuss your own order, material and commercial process with an advisor.
Line planning
Explore the existing production-line planning presentation.
Explore the presentation02 / PRODUCT PREVIEWShop floor
Look at the shop-floor showcase and its execution context.
Explore the presentation03 / PRODUCT PREVIEWProduction costing
Inspect the manufacturing cost presentation.
Explore the presentation04 / PRODUCT PREVIEWQuality control
Explore inspection records and the quality workspace.
Explore the presentationSEE THE RECORD AND THE CONTEXT
A closer look at the experience.
Illustrative records with the complete product context available in a guided advisor conversation.
Turn a size ratio into a piece breakdown.
- Example order pieces
- 3,000
- Example sizes
- 4
- Ratio units
- 1 : 2 : 2 : 1
| Example size | Ratio units | Allocated pieces | Record context |
|---|---|---|---|
| S | 1 | 500 | Local breakdown · not a cutting plan |
| M | 2 | 1,000 | Local breakdown · not a cutting plan |
| L | 2 | 1,000 | Local breakdown · not a cutting plan |
| XL | 1 | 500 | Local breakdown · not a cutting plan |
Static concept canvas, separate from the editable example above. All figures and dates are illustrative. No order, reservation, purchase request, invoice or TNA milestone is created.
Garments workflow · Full walkthrough
See the complete workflow.
Explore your garment, material, factory and order-follow-up questions with an advisor in a guided product conversation.
A FEW USEFUL DETAILS
Understand the example.
Does the ratio example make a cutting plan?
No. It allocates an entered quantity into whole pieces using example ratios. It does not check marker efficiency, fabric consumption, garment specifications or physical cutting constraints.
Why can a size receive one extra piece?
The example uses proportional shares, then assigns the remaining whole pieces to the largest fractional remainders. Equal remainders are resolved in the displayed size order, so the total always matches the entered order quantity.
Can we discuss our own garment process?
Yes. Bring size sets, order breakdowns, production stages and quality or costing questions to an advisor walkthrough.
YOUR OPERATION. YOUR WORKFLOW.
Bring your order’s story to the conversation.
Discuss your style, factory, material and commercial-record questions with an advisor.