Adon ERP / TV & MEDIA OPERATIONS

Behind every programme,
a clearer operational picture.

Explore the planning, resources and commercial context behind a television programme, with room for the detail of your own production workflow.

Explore the example
PROGRAMME / CONCEPT VIEWNot a broadcast signal
THE PROGRAMME STORYBrief → Plan → Handoff
AN ILLUSTRATIVE RUNDOWN05 segments
01Opening02:00
02News segment09:00
03Feature08:00
04Example break03:00
05Closing02:00

Explore timing in the local example below.

Concept production canvas · no live transmission, video playback or audience data

THE WORKFLOW IN CONTEXT

Keep the work behind the screen in view.

Give the programme a clear planning context.

Use the example rundown to discuss segment lengths and handoffs alongside the wider project schedule.

  1. 01Programme brief
  2. 02Segment sequence
  3. 03Schedule context

TRY A SMALL PART OF THE WORKFLOW

Shape an illustrative programme rundown.

Edit five segment durations, choose a start time and compare the total with an example target. The clock is a local planning illustration, not a broadcast automation system.

Local example · not connected
Local planning clock · whole seconds, no broadcast control
Total example duration24:0006:00 under the example target

Durations use mm:ss (maximum 180:00 per segment). Clock labels show +1 day when the example crosses midnight.

Five fictional programme segments with editable durations and calculated start/end clocks
SegmentDuration · mm:ssStartsEnds
EX-01Opening19:00:0019:02:00
EX-02News segment19:02:0019:11:00
EX-03Feature19:11:0019:19:00
EX-04Example break19:19:0019:22:00
EX-05Closing19:22:0019:24:00

This is not frame-accurate timecode, transmission scheduling or media playback. The clock has no date, timezone, station feed, advertising inventory or rights integration.

SEE THE DETAIL AND THE CONTEXT

A closer look at the experience.

Illustrative records with a guided product conversation available through the shared advisor button.

Illustrative preview
AdonERP/ TV / Concept canvasIllustrative records · no live connection

The programme rundown, in view

Example start
19:00:00
Example duration
24:00
Below example target
06:00
TV static illustrative records based on the initial example
Example segmentDurationStartsEnds
Opening02:0019:00:0019:02:00
News segment09:0019:02:0019:11:00
Feature08:0019:11:0019:19:00
Example break03:0019:19:0019:22:00
Closing02:0019:22:0019:24:00

Static concept canvas, separate from the editable local example above. No shop order, donor or beneficiary record, expenditure approval, media playback or transmission is created.

TV workflow · Full walkthrough

See the complete workflow.

Bring your operational questions to an advisor and explore the complete product context in a guided conversation.

A FEW USEFUL DETAILS

Know what you’re exploring.

Does this control a broadcast or play media?

No. There is no playout, streaming, signal monitoring, media playback or transmission integration. The rundown is an editable local timing example.

Are the timings frame-accurate broadcast timecode?

No. The calculator uses whole seconds and a 24-hour clock. It does not model frame rates, timecode standards, transmission rules or a real station schedule.

Can we discuss our own production process?

Yes. Bring programme planning, project cost, equipment and commercial-record questions to a guided product conversation.

YOUR ORGANISATION. YOUR WORKFLOW.

Let’s begin with the way you work.

Bring your records, planning and operational questions to an advisor conversation.