Engineering Maintenance Downtime
Downtime: where the hours go, and the few causes behind most of them
Each stop is logged with a start, an end and a reason. The Pareto puts the reasons in order, so the two or three that cost most of the hours are the ones that get fixed.
Now onboarding companies in Dhaka.
Engineering Maintenance / Downtime
Downtime
Downtime by reason · October
43.5 hThe line is the running share of all hours; the dashed line marks 80%.
Recent stops
+ Log a stop2 Nov 07:40IM-04
Hydraulic5 h 30 m
1 Nov 14:05PP-02
Mould change1 h 15 m
31 Oct 22:10All
Power cut2 h 00 m
Downtime, in three readings
Log every stop, sort the reasons, then act on the top few.
- 1Log
Start, end, reason
From a work order, the line supervisor or the machine itself.
- 2Sort
Biggest cause first
Hours by reason, largest on the left, with a running total.
- 3Act
Fix the top few
The two or three reasons left of 80% are where effort pays.
What each stop records
- Machine
- Which one stopped.
- Start and end
- From the stop to running again.
- Reason
- From a list you keep.
- Planned or not
- PM and changeovers kept apart.
Downtime is the result of everything else in maintenance
Work orders write to it; plans try to reduce it.
Written by
- Equipment
Downtime by machine.
- Work Orders
Repair time on each job.
Leads to
- PM Schedules
Plans for the worst causes.
Where it shows up
- Overview
Availability and MTBF.
- Financial Reports
Cost of lost output.
Downtime the way it happens here
Power cuts, late material and mould changes cost as much as breakdowns. They should be counted too.
Power cuts counted
Kept apart from machine faults.
Material shortages
Shown to supply chain.
Changeovers
Planned stops still cost hours.
Lost output in taka
So the cost is plain.
One month's Pareto, and one fix
A sample review, the way it usually runs.
October shows 43.5 hours of downtime.
Hydraulic faults are 37% of it.
Most are on IM-04's main pump.
A seal change is added to its monthly PM.
Hydraulic hours fall by half.
How different trades use downtime tracking
- Retail
- Fridge and lift outages.
- Food & Hospitality
- Kitchen equipment failures.
- Real Estate
- Lift and pump outages.
- Consulting
- System and vehicle downtime.
- Manufacturing
- Line stops by reason.
- Health & Fitness
- Device downtime by ward.
- Trades
- Vehicle off-road days.
- Others
- Generator outages by site.
Questions we get about downtime
Who logs a stop?
The supervisor, the technician, or a work order.
Can planned stops be left out?
Yes, they are kept apart.
What is a Pareto?
Reasons in order of hours, biggest first.
How is availability worked out?
Planned time less downtime, over planned time.
Can I see lost output?
Yes, using the machine's rate.
Where is Adon ERP available?
We are currently onboarding companies in Dhaka. Book a demo and we will walk through it with sample data.
Bring last month's stoppage log. We will build the Pareto in the demo.
A live demo in English or Bangla, using sample books close to your own trade, with time for your accountant’s questions.