Engineering Maintenance Downtime

Downtime: where the hours go, and the few causes behind most of them

Each stop is logged with a start, an end and a reason. The Pareto puts the reasons in order, so the two or three that cost most of the hours are the ones that get fixed.

See the downtime log

Now onboarding companies in Dhaka.

AdonERP
Nodi Polymer Industries

Engineering Maintenance / Downtime

Downtime

FY 2026-27

Downtime by reason · October

43.5 h
Hydraulic16 hMould change9.5 hPower cut7 hNo material5 hElectrical4 hOther2 h

The line is the running share of all hours; the dashed line marks 80%.

Recent stops

+ Log a stop
  • 2 Nov 07:40IM-04

    Hydraulic5 h 30 m

  • 1 Nov 14:05PP-02

    Mould change1 h 15 m

  • 31 Oct 22:10All

    Power cut2 h 00 m

A partial preview of Downtime in Adon ERP. Company, people and figures are sample data.

Downtime, in three readings

Log every stop, sort the reasons, then act on the top few.

  1. 1
    Log

    Start, end, reason

    From a work order, the line supervisor or the machine itself.

  2. 2
    Sort

    Biggest cause first

    Hours by reason, largest on the left, with a running total.

  3. 3
    Act

    Fix the top few

    The two or three reasons left of 80% are where effort pays.

What each stop records

Machine
Which one stopped.
Start and end
From the stop to running again.
Reason
From a list you keep.
Planned or not
PM and changeovers kept apart.

Downtime is the result of everything else in maintenance

Work orders write to it; plans try to reduce it.

Written by

Leads to

Where it shows up

Downtime the way it happens here

Power cuts, late material and mould changes cost as much as breakdowns. They should be counted too.

  • Power cuts counted

    Kept apart from machine faults.

  • Material shortages

    Shown to supply chain.

  • Changeovers

    Planned stops still cost hours.

  • Lost output in taka

    So the cost is plain.

One month's Pareto, and one fix

A sample review, the way it usually runs.

  1. October shows 43.5 hours of downtime.

  2. Hydraulic faults are 37% of it.

  3. Most are on IM-04's main pump.

  4. A seal change is added to its monthly PM.

  5. Hydraulic hours fall by half.

How different trades use downtime tracking

Retail
Fridge and lift outages.
Food & Hospitality
Kitchen equipment failures.
Real Estate
Lift and pump outages.
Consulting
System and vehicle downtime.
Manufacturing
Line stops by reason.
Health & Fitness
Device downtime by ward.
Trades
Vehicle off-road days.
Others
Generator outages by site.

Questions we get about downtime

Who logs a stop?

The supervisor, the technician, or a work order.

Can planned stops be left out?

Yes, they are kept apart.

What is a Pareto?

Reasons in order of hours, biggest first.

How is availability worked out?

Planned time less downtime, over planned time.

Can I see lost output?

Yes, using the machine's rate.

Where is Adon ERP available?

We are currently onboarding companies in Dhaka. Book a demo and we will walk through it with sample data.

Bring last month's stoppage log. We will build the Pareto in the demo.

A live demo in English or Bangla, using sample books close to your own trade, with time for your accountant’s questions.

Explore Engineering Maintenance