Engineering Maintenance Work Orders

Work orders: every job on a machine, with what it took to fix

A breakdown is reported, a technician takes it, parts come from stores and the checklist is ticked off. When it closes, the hours, the parts and the downtime are all on the job.

See a work order

Now onboarding companies in Dhaka.

  • Breakdown, preventive and improvement work orders
  • A checklist, the technician and the hours on each job
  • Spare parts issued against the work order
  • Downtime from the first report to the machine running again
AdonERP
Nodi Polymer Industries

Engineering Maintenance / Work Orders

Work Orders

Open

5

In progress

6

Waiting for parts

3

Done this month

41

WO-2026-0418 · Breakdown

Hydraulic oil leak at main pump

Injection moulder IM-04 · reported 2 Nov 07:40 by the shift supervisor

Priority 1 Kamal Uddin

Checklist · 3/5

  • Isolate power and lock out
  • Drain hydraulic oil
  • Replace main pump seal kit
  • Refill and bleed the system
  • Test run 30 minutes at full pressure

Parts used

  • Pump seal kit SK-2501 · 18,400
  • Hydraulic oil ISO VG 4660 L · 21,000
Labour
5.5 h · 2,750
Job cost
BDT 42,150
A partial preview of Work Orders in Adon ERP. Company, people and figures are sample data.

A work order, in three stages

Report, repair, close. Each stage leaves something on the record.

  1. 01 · Report

    Something is wrong

    From the floor, by phone or by QR scan, with the machine and what was seen.

  2. 02 · Repair

    A technician works on it

    Tasks ticked off, parts issued from stores, hours booked.

  3. 03 · Close

    Running again

    The cause is recorded, downtime ends, and cost is booked to the machine.

What a work order holds

Machine and type
Breakdown, preventive or improvement.
Priority
From the machine's criticality.
Technician
Who is doing it.
Tasks and parts
Checklist and stores issues.
Cause
Why it failed, for the downtime Pareto.

Work orders are where maintenance actually happens

They take parts out of stores and put hours into the downtime log.

Raised from

Takes from and writes to

Where it shows up

Work orders the way engineering teams here work

Breakdowns at night, a technician on each shift, and parts that may need to be bought.

  • Reported from the floor

    By the operator, on a phone.

  • Handed over by shift

    Open jobs carry to the next team.

  • Waiting for parts

    Kept apart, so delays are visible.

  • Cost on the machine

    Parts and hours add up per job.

One breakdown, from leak to running

A sample job, the way it usually runs.

  1. The supervisor reports an oil leak on IM-04.

  2. Kamal takes the job and isolates the machine.

  3. A seal kit and oil are issued from stores.

  4. The seal is replaced and the system refilled.

  5. Test run passes; the job closes at 5 h 30 m.

How different trades use work orders

Questions we get about work orders

Can operators report faults?

Yes, from a phone or by scanning the machine's QR.

Are parts taken from stock?

Yes, issued to the job from stores.

Is downtime recorded?

Yes, from report to close.

Can a job wait for parts?

Yes, it shows as waiting until parts arrive.

Is the cost posted?

Yes, parts and labour to the accounts.

Where is Adon ERP available?

We are currently onboarding companies in Dhaka. Book a demo and we will walk through it with sample data.

Bring last week's job cards. We will enter them as work orders in the demo.

A live demo in English or Bangla, using sample books close to your own trade, with time for your accountant’s questions.

Explore Engineering Maintenance