Material & production planning

Turn demand into
a material-ready plan.

Bring demand, BOM requirements, available stock and scheduled receipts into the same planning conversation. Identify shortages before they hold up production.

Explore the workspace
LDPE resin / Sample requirement
Gross demand1,200 kg
Available supply720 kg
−
Plan the net requirement480 kg short

Review supply timing before release.

Demand − available supply = the next material decision.

MRP Planning · In focus

Material requirements with a clear next action.

Explore an illustrative planning run. Compare material coverage and inspect the proposed action for each requirement.

Adon ERP/ Manufacturing
Interactive sample

MRP Planning

Select a sample record to explore its production context.

Sample data
Sample records
4
3 visible status categories
Shortage records
2
Across the full sample set
Net material requirement
780
kg · all sample records
Sample MRP Planning records. Select a reference to view its details.
Reference / recordStatusNet requirementMaterial coverage
MO-0148 · Film extrusionShortage480 kgMaterial coverage60%
MO-0148 · Color additiveCovered0 kgMaterial coverage100%
MO-0147 · Carton conversionShortage300 kgMaterial coverage50%
MO-0146 · Flexo printIncoming0 kgMaterial coverage80%

Showing 4 of 4 sample records

Illustrative product preview. No live ERP records are changed.Search, filter and select a record

MRP Planning · Full walkthrough

See the complete workflow.

Book a guided demo to explore the full workspace, records and production process.

A clear way to work

From first step to follow-through.

A practical sequence for mrp planning, with the production context kept together.

  1. 01

    Collect demand

    Review order demand and the master production schedule.

  2. 02

    Expand the BOM

    Translate planned output into component requirements.

  3. 03

    Net available supply

    Account for stock, reservations and scheduled receipts.

  4. 04

    Review exceptions

    Resolve shortages and consider timed supply proposals.

See your production in context

Take a closer look at mrp planning.

Walk through the workflow with your production team and explore how it fits your operation.