Production foundation

Every input accounted for.
Every output defined.

Build a clear production recipe for materials, quantities and expected outputs. Include co-products, by-products and scrap so the production model reflects the real process.

Explore the workspace
02 / Defined output

1,000 kg

Plain colour sheet · 98% yield

BOM-CTL-PLAIN
Supplied production recipe
Materials + quantities + yield = a production-ready recipe.

Bill of Materials · In focus

Production recipes, down to the material line.

Explore the supplied steel-product BOM register and the plain-sheet recipe, including input, scrap, yield and estimated cost.

AdonERPManufacturingBill of Materials
Alif Steel Mills Ltd

Bill of Materials

Software data preview
10 of 10 supplied BOMs
Steel product BOM register from the supplied software screenshot
BOMProductTypeOutputYieldLines
BOM-CTL-PLAINDefaultAlif Plain Colour Sheet 0.40 mm CNG GreenPS-040-GRNStandard1,000 kg98%2
BOM-CORR-CDDefaultAlif Colour Sheet — Cherry Dew profile 0.25 mm Alif BlueCS-CD-025-BLUStandard1,000 kg98%2
BOM-CORR-BDDefaultAlif Colour Sheet — Boro Dew profile 0.30 mm CNG GreenCS-BD-030-GRNStandard1,000 kg98%2
BOM-CCL-032-GIDefaultAlif Colour Coil 0.32 mm — CNG Green (on GI Z120)CC-032-GI-GRNStandard1,000 kg98%6
BOM-CCL-032-BLUDefaultAlif Colour Coil 0.32 mm — Alif Blue (on AZ100)CC-032-BLUStandard1,000 kg98%6
BOM-CCL-025-BLUDefaultAlif Colour Coil 0.25 mm — Alif Blue (on AZ100)CC-025-BLUStandard1,000 kg98%6
BOM-CCL-040-GRNDefaultAlif Colour Coil 0.40 mm — CNG Green (on in-house AZ150)CC-040-GRNStandard1,000 kg98%6
BOM-CCL-030-GRNDefaultAlif Colour Coil 0.30 mm — CNG Green (on in-house AZ150)CC-030-GRNStandard1,000 kg98%6
BOM-CGL-040DefaultAlif Galvalume coil AZ150 0.40 mm × 1219 mmSF-GL-040Standard1,000 kg98%3
BOM-CGL-030DefaultAlif Galvalume coil AZ150 0.30 mm × 1000 mmSF-GL-030Standard1,000 kg98%3
Static demo excerpt recreated from the supplied software screenshots. Preview controls do not change ERP records.

Bill of Materials · Full walkthrough

See the complete workflow.

Book a guided demo to explore the full workspace, records and production process.

A clear way to work

From first step to follow-through.

A practical sequence for bill of materials, with the production context kept together.

  1. 01

    Define the output

    Choose the finished product, BOM type and batch quantity.

  2. 02

    Build the inputs

    Add material quantities with the correct units of measure.

  3. 03

    Account for yield

    Identify co-products, by-products, process loss and scrap.

  4. 04

    Use the recipe

    Link the approved BOM to planning and production orders.

See your production in context

Take a closer look at bill of materials.

Walk through the workflow with your production team and explore how it fits your operation.