Production foundation
Give every operation
the right place to run.
Bring machines, teams and external resources into one production model. Define working hours, practical capacity and rates before the first job reaches the floor.
Work Centers · In focus
The resources behind your production.
Colour coating, galvalume, corrugation and cut-to-length work centers from the supplied software records.
A closer look at the real workflow.
Work Centers
Software data preview- Work centers
- 8
- Machine resources
- 7
- Labor groups
- 1
| Name | Code | Type | Capacity | Efficiency | Ops |
|---|---|---|---|---|---|
| Colour Coating Line — entry, cleaning & pre-treatment | WC-CCL-PRE | Machine | — | — | 1 |
| Colour Coating Line — exit, inspection & recoil | WC-CCL-EXIT | Machine | — | — | 1 |
| Colour Coating Line — finish & back coater & oven | WC-CCL-FIN | Machine | — | — | 1 |
| Colour Coating Line — primer coater & oven | WC-CCL-PRIME | Machine | — | — | 1 |
| Continuous Galvalume Line (CGL) — furnace & Al–Zn pot | WC-CGL | Machine | — | — | 3 |
| Corrugation — Boro Dew roll former | WC-CORR-BD | Machine | — | — | 1 |
| Corrugation — Cherry Dew roll former | WC-CORR-CD | Machine | — | — | 0 |
| Cut-to-length, stacking & bundling | WC-CTL | Labor Group | — | — | 1 |
Work Centers · Full walkthrough
See the complete workflow.
Book a guided demo to explore the full workspace, records and production process.
A clear way to work
From first step to follow-through.
A practical sequence for work centers, with the production context kept together.
- 01
Define the resource
Choose a machine, labor group, line or external work center.
- 02
Set its calendar
Record shifts, working hours and expected downtime.
- 03
Assign capacity & rates
Set practical capacity and the rates used in production costing.
- 04
Connect operations
Reuse the resource in routings and review its planned load.
Built to work together
Keep the production context.
Follow the related parts of Manufacturing that give this work its inputs, operating context and next step.
Capacity with context
Use practical hours to make planning decisions grounded in resource availability.
Explore moduleOne resource, many routes
Keep reusable work centers connected to the operations they perform.
Explore moduleRates that explain cost
Carry labor, machine and overhead assumptions into standard cost cards.
Explore moduleSee your production in context
Take a closer look at work centers.
Walk through the workflow with your production team and explore how it fits your operation.