Manufacturing cost control

Know the expected cost.
Before production starts.

Bring BOM materials, routing time and work-center rates into a standard production cost. Keep a dated baseline for comparing what the order actually costs.

Explore the workspace
COST CARD / SAMPLE BASIS
Expected batch costBDT25,000

1,000-unit production basis

Materials18,500
Labor2,400
Machine1,600
Overhead2,500
Versioned assumptionsA stable comparison point
The standard is built from materials, time and resource rates.

Standard Costing · In focus

An expected cost you can explain.

Explore the component breakdown of an illustrative 1,000-unit cost card. Values are sample BDT amounts.

Adon ERP/ Manufacturing
Interactive sample

Standard Costing

Select a sample record to explore its production context.

Sample data
Sample records
4
2 visible status categories
Reviewed records
3
Across the full sample set
Sample standard batch cost
25,000
BDT · all sample records
Visible cost componentsBDT 25,000

Showing 4 of 4 sample records

Illustrative product preview. No live ERP records are changed.Search, filter and select a record

Standard Costing · Full walkthrough

See the complete workflow.

Book a guided demo to explore the full workspace, records and production process.

A clear way to work

From first step to follow-through.

A practical sequence for standard costing, with the production context kept together.

  1. 01

    Review the basis

    Confirm the BOM, routing and work-center rate assumptions.

  2. 02

    Roll up components

    Combine material, labor, machine and overhead cost.

  3. 03

    Review output shares

    Check allocation assumptions for joint production outputs.

  4. 04

    Freeze the version

    Retain a dated standard for later actual-cost comparison.

See your production in context

Take a closer look at standard costing.

Walk through the workflow with your production team and explore how it fits your operation.