Colour coating resources8 work centers in the register
生产基础
为每道工序
找到合适的位置。
将设备、班组和外部资源纳入同一个生产模型。在第一个任务到达车间之前,先定义工作时间、实际产能和费率。
MachinesTeamsExternal resources
工作中心 · 聚焦
支撑生产的资源。
来自所提供软件记录的彩涂、镀铝锌、压瓦和定尺剪切工作中心。
近距离了解真实的工作流程。
AdonERPManufacturingWork Centers
Alif Steel Mills Ltd
Work Centers
Software data preview- Work centers
- 8
- Machine resources
- 7
- Labor groups
- 1
| Name | Code | Type | Capacity | Efficiency | Ops |
|---|---|---|---|---|---|
| Colour Coating Line — entry, cleaning & pre-treatment | WC-CCL-PRE | Machine | — | — | 1 |
| Colour Coating Line — exit, inspection & recoil | WC-CCL-EXIT | Machine | — | — | 1 |
| Colour Coating Line — finish & back coater & oven | WC-CCL-FIN | Machine | — | — | 1 |
| Colour Coating Line — primer coater & oven | WC-CCL-PRIME | Machine | — | — | 1 |
| Continuous Galvalume Line (CGL) — furnace & Al–Zn pot | WC-CGL | Machine | — | — | 3 |
| Corrugation — Boro Dew roll former | WC-CORR-BD | Machine | — | — | 1 |
| Corrugation — Cherry Dew roll former | WC-CORR-CD | Machine | — | — | 0 |
| Cut-to-length, stacking & bundling | WC-CTL | Labor Group | — | — | 1 |
工作中心 · 完整演示
查看完整的工作流程。
预约引导式演示,了解完整的工作区、记录和生产流程。
清晰的工作方式
从第一步到 完整落实。
工作中心的实用步骤,让生产背景保持在一起。
- 01
定义资源
选择设备、人工组、产线或外部工作中心。
- 02
设置日历
记录班次、工作时间和预期停机。
- 03
分配产能与费率
设置有效产能以及用于生产成本核算的费率。
- 04
关联工序
在工艺路线中复用该资源,并查看其计划负荷。
为协同而生
保持 生产背景。
跟随制造中的相关部分,它们为这项工作提供输入、运行背景和下一步。
在背景中看您的生产
进一步了解工作中心。
与您的生产团队一起走一遍工作流程,看看它如何适配您的运营。