物料与生产计划

为需求腾出空间。 在作出承诺之前。

将计划工作量与实际资源产能进行比较。让超负荷的时段清晰可见,并审视每项生产承诺背后的工作中心选择。

Supplied weekly capacity snapshot

0%RECORDED UTILIZATIONAvailableOverloaded
Zero overloads in the supplied view. Undated work is not placed.
探索工作区

产能计划 · 聚焦

产能与负荷,异常尽收眼底。

所提供的八个工作中心视图包含按周分段、一个未定日期的生产订单和已记录的产能调整。

AdonERPManufacturingCapacity Planning
Alif Steel Mills Ltd

Capacity Planning

Software data preview
Work centers
8
Overloaded
0
Undated MOs
1
Planning horizon
Weekly · 8 buckets

1 production order has no planned date. Its load is not placed in the weekly view.

Eight work centers across W45 to W52 in the supplied capacity snapshot
Work centerW45W46W47W48W49W50W51W52Utilization
Colour Coating Line — entry, cleaning & pre-treatment········0%
Colour Coating Line — exit, inspection & recoil········0%
Colour Coating Line — finish & back coater & oven········0%
Colour Coating Line — primer coater & oven········0%
Continuous Galvalume Line (CGL) — furnace & Al–Zn pot········0%
Corrugation — Boro Dew roll former········0%
Corrugation — Cherry Dew roll former········0%
Cut-to-length, stacking & bundling········0%

Capacity overrides (28)

Visible capacity override examples from the supplied screenshot
Work centerDateCapacity override
WC-CCL-FINSep 4, 20261,372 min
WC-CCL-EXITSep 7, 2026408 min
WC-CORR-BDSep 7, 2026530 min
WC-CCL-PRESep 9, 2026435 min
WC-CCL-PRESep 10, 2026402 min
WC-CCL-PRESep 12, 2026412 min
WC-CCL-FINSep 16, 2026491 min
WC-CCL-FINSep 18, 2026375 min

Eight visible override examples are included from the screenshot; the source view reports 28.

Static demo excerpt recreated from the supplied software screenshots. Preview controls do not change ERP records.

产能计划 · 完整演示

查看完整的工作流程。

预约引导式演示,了解完整的工作区、记录和生产流程。

清晰的工作方式

从第一步到 完整落实。

产能计划的实用步骤,让生产背景保持在一起。

  1. 01

    从负荷开始

    按工作中心和时段收集计划工序工时。

  2. 02

    应用日历

    将工作与实际班次和工作时间进行比较。

  3. 03

    找出约束

    识别超负荷的资源和不可用的时段。

  4. 04

    平衡计划

    审视备用资源、时间安排和产能假设。

在背景中看您的生产

进一步了解产能计划。

与您的生产团队一起走一遍工作流程,看看它如何适配您的运营。