THE MASTER PLAN
Weekly buckets · Supplied plan

Make room
for what’s next.

WEEK45
WEEK46
WEEK47
WEEK48
WEEK49
WEEK50
WEEK51
WEEK52
CC-025-BLU · On hand47,903.06 kg
Colour coil 0.25 mm · Reorder point 2,000.

物料与生产计划

给需求一个日期。
给生产一个方向。

将产品需求转化为按时间分段的生产计划。在详细排程开始之前,统一数量、计划期间和供应假设。

探索工作区

主生产计划(MPS) · 聚焦

生产计划,逐段呈现。

预览所提供彩涂卷产品的周计划,包括需求、收货、MPS数量和预计库存。

AdonERPManufacturingMaster Production Schedule
Alif Steel Mills Ltd

Master Production Schedule

Software data preview
Bucket
Weekly
Horizon
8 buckets
Warehouse
—
Include forecast
No

Alif Colour Coil 0.25 mm — Alif Blue (on AZ100)CC-025-BLU

On hand: 47,903.06 kgReorder point: 2,000
Weekly MPS snapshot for CC-025-BLU
Planning rowW45W46W47W48W49W50W51W52
Demand········
Scheduled receipts········
MPS
Projected on-hand47,903.0647,903.0647,903.0647,903.0647,903.0647,903.0647,903.0647,903.06
Suggested········
ATP47,903.06———————

Alif Colour Coil 0.30 mm — CNG Green (on in-house AZ150)CC-030-GRN

On hand: 34,935.63 kgReorder point: 2,000
Weekly MPS snapshot for CC-030-GRN
Planning rowW45W46W47W48W49W50W51W52
Demand········
Scheduled receipts········
MPS
Projected on-hand34,935.6334,935.6334,935.6334,935.6334,935.6334,935.6334,935.6334,935.63
Suggested········
ATP34,935.63———————
Static demo excerpt recreated from the supplied software screenshots. Preview controls do not change ERP records.

主生产计划(MPS) · 完整演示

查看完整的工作流程。

预约引导式演示,了解完整的工作区、记录和生产流程。

清晰的工作方式

从第一步到 完整落实。

主生产计划(mps)的实用步骤,让生产背景保持在一起。

  1. 01

    审视需求

    查看产品需求和预期库存需要。

  2. 02

    设定时段目标

    为每个计划窗口选择生产数量。

  3. 03

    检查可行性

    审视物料可用性和资源产能。

  4. 04

    批准基准

    用达成一致的排程指导详细计划。

在背景中看您的生产

进一步了解主生产计划(mps)。

与您的生产团队一起走一遍工作流程,看看它如何适配您的运营。